With the new warehouse now up and running we’re busy populating our new cable storage racking. All 180 linear metres of it. With every item bar-coded and its position on the rack recorded, prepping for jobs has never been easier and faster.
Features of the new facility include:
> 400 linear metres of heavy-duty shelf space
> 6 metres high to enable large screens to be pre-built
> A workshop for building sets and bespoke rigging
> A massive prep area so all jobs can be pre-built and tested before shipping
Most importantly, a really nice kitchen – food is so important to us.
Exciting times for us and our clients.